{"id":478,"date":"2024-08-08T11:53:52","date_gmt":"2024-08-08T11:53:52","guid":{"rendered":"https:\/\/rhatiganabm.com\/?p=478"},"modified":"2024-08-15T09:57:17","modified_gmt":"2024-08-15T09:57:17","slug":"cbs-secondary-school-kilkenny-august-2024-update","status":"publish","type":"post","link":"https:\/\/rhatiganabm.com\/?p=478","title":{"rendered":"CBS Secondary School, Kilkenny \u2013 August 2024 update"},"content":{"rendered":"\n<p><\/p>\n\n\n\n<p><strong>Dear Neighbour,<\/strong><br>Welcome to our August 2024 issue of our Neighbourhood Update for CBS Secondary School, Kilkenny. Please take a moment to read this notice about the upcoming works in your locality.<br>Works since last neighbourhood update<br>Works include:<br><\/p>\n\n\n\n<p><strong>Section 7A (School and associated site works)<\/strong><br>\u2022Zone B + D Remaining Precast Superstructure Ongoing<br>\u2022Boundary Gabion Basket Construction Ongoing<br>\u2022External Windows\/Doors and Curtain Walling Ongoing<br>\u2022Internal M+E 1st and 2nd fix ongoing.<br>\u2022Outer Leaf Blockwork ongoing<br>\u2022Roof Finishes ongoing<br>Kerbing and Footpaths Ongoin<br><\/p>\n\n\n\n<p><strong>Section 7B (including East Dunningstown)<\/strong><br>\u2022CBS Access Road Tarmac Basecourse has commenced.<br>\u2022Kerbing and Footpaths Ongoing<br>\u2022Traffic Management for Section 2 Dunningstown Road Works (East) has now commenced<br>\u2022Installation of below ground services adjacent to Dunningstown Road (East) ongoing<br><\/p>\n\n\n\n<p><strong>Section 7C (including West Dunningstown)<\/strong><br>\u2022Traffic Management for Section 2 Dunningstown Road Works (West) has now commenced.<br>\u2022Installation of below ground services adjacent to Dunningstown Road (West) ongoing<\/p>\n\n\n\n<p><br><strong>Section 7D (including Talbots Gate\/Court and Freshford Road Junction)<\/strong><br>\u2022Site Entrance for Construction Traffic to CBS School Site<br>\u2022Commenced Kerbing within Talbots Green.<br><\/p>\n\n\n\n<p>All the necessary Health and Safety systems and traffic management will be put in place to always ensure your safety during these works.<br><\/p>\n\n\n\n<p><strong>CONSTRUCTION WORK HOURS &amp; PARKING<\/strong><br>Monday to Friday &#8211; as per planning.<br>Saturday &#8211; as per planning.<br>Provision for parking has been made within our compound (Lands off Dunningstown Road South adjacent to the new<br>school) for our construction workers and for all construction related traffic.<br><\/p>\n\n\n\n<p><strong>HEALTH, SAFETY &amp; ENVIRONMENT<\/strong><br>As the Main Contractor the health and safety of our workers<br>and the public is a top priority for JJ Rhatigan\/ABM.<br>It is important that children\/teenagers understand that construction sites are not a safe place to play, and they<br>should not try to enter construction sites at any time and\/or<br>MUST NOT ENTER SITE AT ANY TIME. We would<br>appreciate parents\u2019 assistance in getting this point across to young children.<br>Construction sites are defined as high-risk work areas with those who work on site having specialised training and<br>equipment to undertake their tasks.<br><\/p>\n\n\n\n<p>JJ Rhatigan &amp; Company is proud to support and cooperate with the Considerate Constructors Scheme to commit to<br>care regarding the appearance of our site, respect the<br>community in which we work, protect the environment by<br>our methods of working and choice of design and<br>materials, secure everyone\u2019s safety and value our<br>workforce. We strive to maintain the highest standards on<br>all our projects.<br><\/p>\n\n\n\n<p><strong>UPCOMING WORKS<\/strong><br><strong>Section 7D (including Talbots Gate\/Court and Freshford Road Junction)<\/strong><br>Removing Trees in Talbots Gate\/Court.<br>-Traffic Management Setup will commence Monday 12-08-24.<br>-Pruning\/Trimming will commence Monday 12-08-24.<br>Following above commence Road enabling works in Talbots including Traffic Management.<br><\/p>\n\n\n\n<p>We apologies in advance for any inconvenience the construction activities may cause and to thank you for your<br>patience and consideration. Please be advised that it is our policy to ensure that all efforts be made to ensure minimal disruption to the neighbourhood for the duration of the<br>construction period.<\/p>\n\n\n\n<p>The Project Nore website is available to view also at www.rhatiganabm.com<\/p>\n\n\n\n<p><strong>PROJECT QUERIES<\/strong><br>Should you require any further information please do not hesitate to contact us:<br>Shane Kennedy, JJ Rhatigan Project Manager skennedy@jjrhatigan.com<\/p>\n\n\n\n<p><\/p>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-image size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"687\" height=\"689\" src=\"https:\/\/rhatiganabm.com\/wp-content\/uploads\/2024\/08\/CBS-Neighbourhood-Update-August-Newsletter-2024-Rev.jpg\" alt=\"\" class=\"wp-image-481\" style=\"width:656px;height:auto\" srcset=\"https:\/\/rhatiganabm.com\/wp-content\/uploads\/2024\/08\/CBS-Neighbourhood-Update-August-Newsletter-2024-Rev.jpg 687w, https:\/\/rhatiganabm.com\/wp-content\/uploads\/2024\/08\/CBS-Neighbourhood-Update-August-Newsletter-2024-Rev-300x300.jpg 300w, https:\/\/rhatiganabm.com\/wp-content\/uploads\/2024\/08\/CBS-Neighbourhood-Update-August-Newsletter-2024-Rev-150x150.jpg 150w\" sizes=\"auto, (max-width: 687px) 100vw, 687px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"659\" height=\"381\" src=\"https:\/\/rhatiganabm.com\/wp-content\/uploads\/2024\/08\/CBS-Neighbourhood-Update-August-Newsletter-2024-Rev-1-1.jpg\" alt=\"\" class=\"wp-image-483\" srcset=\"https:\/\/rhatiganabm.com\/wp-content\/uploads\/2024\/08\/CBS-Neighbourhood-Update-August-Newsletter-2024-Rev-1-1.jpg 659w, https:\/\/rhatiganabm.com\/wp-content\/uploads\/2024\/08\/CBS-Neighbourhood-Update-August-Newsletter-2024-Rev-1-1-300x173.jpg 300w\" sizes=\"auto, (max-width: 659px) 100vw, 659px\" \/><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Dear Neighbour,Welcome to our August 2024 issue of our Neighbourhood Update for CBS Secondary School, Kilkenny. Please take a moment to read this notice about the upcoming works [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":66,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-478","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"_links":{"self":[{"href":"https:\/\/rhatiganabm.com\/index.php?rest_route=\/wp\/v2\/posts\/478","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/rhatiganabm.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/rhatiganabm.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/rhatiganabm.com\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/rhatiganabm.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=478"}],"version-history":[{"count":4,"href":"https:\/\/rhatiganabm.com\/index.php?rest_route=\/wp\/v2\/posts\/478\/revisions"}],"predecessor-version":[{"id":485,"href":"https:\/\/rhatiganabm.com\/index.php?rest_route=\/wp\/v2\/posts\/478\/revisions\/485"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/rhatiganabm.com\/index.php?rest_route=\/wp\/v2\/media\/66"}],"wp:attachment":[{"href":"https:\/\/rhatiganabm.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=478"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/rhatiganabm.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=478"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/rhatiganabm.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=478"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}